New houses
A full build on a Plymouth lot. We hold the ridge geometry, the entry, and the closeout list in one sequence.
Stake, foundation, dry-in, then rooms. The certificate of occupancy is the finish line, not a photo for a brochure. South Shore freeze and salt air are in the wall assembly from the first drawing.
A full build on a Plymouth lot. We hold the ridge geometry, the entry, and the closeout list in one sequence.
New floor area tied into an existing roof. The valley, the flashing line, and the old siding are drawn before demolition.
Kitchens, baths, and the rooms a family cannot vacate. Dust stops, a live sink, and a week-by-week note.
Punch, paint touch, hardware, and the last walk. We leave when the list is empty, not when the dumpster is scheduled.